We chug along in the cold. It's uncomfortable to work outside too long. There are now three propane wall heaters installed in the greenhouse -- one in each section. The sole exception is the long end, which will be kept as a cool room.

I planted some bulbs in pots yesterday and started the clean-up. The Old furnace is out on the grass, waiting to be disposed of. Today, I'll put down new gravel on the floor and work on organizing the potting room a little better.

We bought bamboo flooring for the old house. It was on sale; is environmentally friendly; pre-finished and very attractive. It supposed to be harder than oak flooring and doesn't require adhesive. We'll just nail it in a room at a time, as I complete the painting and trimwork.

Next project plan: a goat nursery in the green dairy barn. Since I've abandoned plans for a dairy, it makes sense to set up "jugs" (little stalls) for kidding during the winter. It will be an annex to the big barn to reduce crowding. Since there is concrete on the floor, it should be easier to keep clean and to heat when the weather is brutal. I'd like to set up a warming crib (perhaps an empty Rubbermaid trough) with a safe heat lamp over it, for emergency warmth for newborns.

Well, it's good to have goals, I suppose. I envision a row of small stalls made with cattle panels and with old carpeting attached to the sides to keep down drafts. Each stall would have a place for a hanging feeder and a water bucket. We already have hay bales in that barn, so the wasted hay could provide soft bedding and extra warmth.

I'll let you know if we actually accomplish this before kidding starts.